Dake Euromatic Series User Manual Page 34

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 33
370 S 370 S L 370 PP 370 PP L
34
EUROMATIC 370 PP / S MAINTENANCE SCHEDULE
FERROUS HEAD
370PP /S
A: Gear box. Maintain safe level of oil. Oil should be visible through sight glass on the right side of the gear box
when machine is running. Note: Oil will appear foamy during operation. When running at high speed oil may weep from
filler cap. This is normal and will subside once machine has expelled out the excess oil in gear box.
B: Air oiler Located on the air regulator.
Air must be dry and clean. Use appropriate measures to
insure this, before it enters the machine.
WARNING!!!!!
LOCK OUT AIR SUPPLY TO THE MACHINE BEFORE REMOVING OIL RESIVOIR PLUG.
C: Head feed cylinder. The oil reservoir is mounted into the cylinder. The reservoir is clear and you can visually
inspect the amount. When oil level is approximately a depth of 1/4” oil must be added
To fill reservoir, remove brass cap on top and add oil into the reservoir until full cycle head to bleed.
D: Chip drawer. Located behind the front access door, This drawer pulls easily out for cleaning.
E: Coolant. This pan is located under chip drawer. The coolant should be kept clean. When coolant needs changing,
remove the drain plug from the pan.
F: Way Oiler. This reservoir is on the back of the column. This reservoir should be kept topped off. At the beginning
of each shift, this should be pumped twice to maintain good lubrication for the ways.
G: Gib blocks. This acts as an adjustable guide for the gear box. If adjustment is needed
See the gib block adjustment section in this manual
H: Vise gib can be adjusted by loosening the lock nuts and turning the set screws equally.
This should be done when ever vise shifts left or right when clamping.
I: Chip brush. Replace as needed.
J: Excessive backlash. This can be reduced, by removing the spindle shaft cover plate on the lower right hand side of
the gear box. Using the set screws in plate, loosen mounting bolt and tighten set screws tightening these set screws will pull the
plate away for gear box and allow removal of the plate. With plate removed tighten spindle nut and replace plate in reverse
order. Proper backlash will be approximately. 1/16” to 1/8” play in spindle with blade on the spindle.
Maintenance Schedule
Item Model Daily Weekly Monthly 100 Hours 6 Months
Gear Box Oil 370 PP / S change after first
change
Air Regulator oiler 370 PP / S check / add
Head Feed Cylinder Oil 370 PP / S add as needed
Coolant Water based 370 PP / S check / add change
Chip Drawer 370 PP / S empty
Gib Adjustment (Head) 370 PP / S check as needed
Vise Gib Adjustment 370 PP / S check as needed
Way Oiler 370 PP / S 2 pumps check / add
DRO Magnetic Strip 370 PP wipe / clean
DRO Reader Adjustment 370 PP check / set if needed
Lube Types Head Feed Cylinder.-DTE 24
Hydraulic Oil
Page view 33
1 2 ... 29 30 31 32 33 34 35 36

Comments to this Manuals

No comments